PrimeGrid
Please visit donation page to help the project cover running costs for this month

Advanced search

Message boards : Project Staging Area : Very long tasks?

Author Message
DoctorNowProject donor
Avatar
Send message
Joined: 9 Jan 06
Posts: 69
ID: 2121
Credit: 110,391,984
RAC: 29,299
321 LLR Gold: Earned 500,000 credits (535,517)Cullen LLR Gold: Earned 500,000 credits (549,224)ESP LLR Gold: Earned 500,000 credits (516,250)Generalized Cullen/Woodall LLR Gold: Earned 500,000 credits (513,115)PPS LLR Gold: Earned 500,000 credits (856,796)PSP LLR Gold: Earned 500,000 credits (717,680)SoB LLR Gold: Earned 500,000 credits (746,589)SR5 LLR Gold: Earned 500,000 credits (509,394)SGS LLR Gold: Earned 500,000 credits (568,607)TRP LLR Gold: Earned 500,000 credits (560,267)Woodall LLR Gold: Earned 500,000 credits (513,367)321 Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,044,369)Cullen/Woodall Sieve (suspended) Ruby: Earned 2,000,000 credits (4,280,178)Generalized Cullen/Woodall Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,027,256)PPS Sieve Sapphire: Earned 20,000,000 credits (20,156,175)Sierpinski (ESP/PSP/SoB) Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,153,418)TRP Sieve (suspended) Gold: Earned 500,000 credits (502,748)AP 26/27 Sapphire: Earned 20,000,000 credits (20,161,205)WW Silver: Earned 100,000 credits (360,000)GFN Sapphire: Earned 20,000,000 credits (25,683,733)PSA Sapphire: Earned 20,000,000 credits (29,444,813)
Message 20875 - Posted: 8 Feb 2010 | 18:55:58 UTC

Hi there!

It seems I got two very long tasks on my X2, which want to run for some days I guess, here's the text excerpt from the windows:

1.) PRPNet Server version 2.4.7
for PSP first pass test
Starting Proth prime test of 90527*2^8487263+1
Using FFT length 768K, a = 3
90527*2^8487263+1, bit: 440000 / 8487279 [5.18%]. Time per bit: 33.036 ms.

2.) PRPNet Server version 2.4.7
for PSP first pass test
Starting Proth prime test of 237019*2^8486962+1
Using zero-padded FFT length 896K, a = 3
237019*2^8486962+1, bit: 360000 / 8486979 [4.24%]. Time per bit: 41.348 ms..

Can I be sure that they meet the deadline respective when do they need to be returned?
In the past logs of PPS tasks were already worn out the next day, when I closed the windows and restarted/returned them later.
____________
Life is Science, and Science rules. To the universe and beyond
Proud member of BOINC@Heidelberg

Profile AlanProject donor
Avatar
Send message
Joined: 8 Oct 08
Posts: 88
ID: 30274
Credit: 19,927,031
RAC: 0
321 LLR Gold: Earned 500,000 credits (512,643)Cullen LLR Silver: Earned 100,000 credits (108,729)PPS LLR Ruby: Earned 2,000,000 credits (2,236,977)PSP LLR Silver: Earned 100,000 credits (219,046)SoB LLR Silver: Earned 100,000 credits (313,785)SGS LLR Amethyst: Earned 1,000,000 credits (1,897,893)TPS LLR (retired) Bronze: Earned 10,000 credits (20,348)TRP LLR Amethyst: Earned 1,000,000 credits (1,415,281)Woodall LLR Silver: Earned 100,000 credits (101,391)321 Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,015,670)Cullen/Woodall Sieve (suspended) Ruby: Earned 2,000,000 credits (2,473,848)PPS Sieve Turquoise: Earned 5,000,000 credits (7,409,400)Sierpinski (ESP/PSP/SoB) Sieve (suspended) Silver: Earned 100,000 credits (229,489)TRP Sieve (suspended) Silver: Earned 100,000 credits (318,658)AP 26/27 Amethyst: Earned 1,000,000 credits (1,612,729)PSA Bronze: Earned 10,000 credits (41,286)
Message 20876 - Posted: 8 Feb 2010 | 19:02:15 UTC - in response to Message 20875.

Those appear to be PSP tasks rather than PPS tasks. The n value for PSP tasks (in this case n=8.4M) is about 10x that of PPS tasks.
____________

DoctorNowProject donor
Avatar
Send message
Joined: 9 Jan 06
Posts: 69
ID: 2121
Credit: 110,391,984
RAC: 29,299
321 LLR Gold: Earned 500,000 credits (535,517)Cullen LLR Gold: Earned 500,000 credits (549,224)ESP LLR Gold: Earned 500,000 credits (516,250)Generalized Cullen/Woodall LLR Gold: Earned 500,000 credits (513,115)PPS LLR Gold: Earned 500,000 credits (856,796)PSP LLR Gold: Earned 500,000 credits (717,680)SoB LLR Gold: Earned 500,000 credits (746,589)SR5 LLR Gold: Earned 500,000 credits (509,394)SGS LLR Gold: Earned 500,000 credits (568,607)TRP LLR Gold: Earned 500,000 credits (560,267)Woodall LLR Gold: Earned 500,000 credits (513,367)321 Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,044,369)Cullen/Woodall Sieve (suspended) Ruby: Earned 2,000,000 credits (4,280,178)Generalized Cullen/Woodall Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,027,256)PPS Sieve Sapphire: Earned 20,000,000 credits (20,156,175)Sierpinski (ESP/PSP/SoB) Sieve (suspended) Amethyst: Earned 1,000,000 credits (1,153,418)TRP Sieve (suspended) Gold: Earned 500,000 credits (502,748)AP 26/27 Sapphire: Earned 20,000,000 credits (20,161,205)WW Silver: Earned 100,000 credits (360,000)GFN Sapphire: Earned 20,000,000 credits (25,683,733)PSA Sapphire: Earned 20,000,000 credits (29,444,813)
Message 20878 - Posted: 8 Feb 2010 | 19:14:37 UTC - in response to Message 20876.
Last modified: 8 Feb 2010 | 19:14:49 UTC

Those appear to be PSP tasks rather than PPS tasks.

Drat, you are right:

[2010-02-08 13:01:47 GMT] PSPtest: Getting work from server www.psp-project.de a
t port 7100

Didn't had an eye on that at first look...
I guess I cancel them, these are taking me too long.
____________
Life is Science, and Science rules. To the universe and beyond
Proud member of BOINC@Heidelberg

Message boards : Project Staging Area : Very long tasks?

[Return to PrimeGrid main page]
DNS Powered by DNSEXIT.COM
Copyright © 2005 - 2020 Rytis Slatkevičius (contact) and PrimeGrid community. Server load 3.30, 3.23, 3.28
Generated 5 Dec 2020 | 18:56:44 UTC